Architectural Coordinator @ Hyundai Engineering & Construction, Singapore (2014-2015)

As a Main Contractor Architectural Coordinator, my role is to monitor the project progress making sure the infrastructure is built according to the Architectural plans. Assisting the Architectural Manager in site supersvision, dealing with site issues, site meetings and checking shop drawings. Coordination with in-house Architectural , Structural, Mechanical, Electrical Engineers and outside as well.

The project is a Metro Raiway Transit (MRT) Station in Singapore namely the Downtownline Macpherson Station. It is an underground infrastructure with 2 accessible entrances for the public.

 

Architectural Illustrations and Actual photos are done by others.
 

 